Community

Engineering Infrastructure Works for Pak Shek Kok Development - Road L3 & L7

Major scope of this project included:
1. Construction of single two-lane carriageway (Road L3), approximately 65 metres in length and 10.3 metres in width;
2. Construction of single two-lane carriageway (Road L7), approximately 510 metres in length and 10.3 metres in width;
3. A section of 250-metre elevated road (Road L7 Bridge) crossing over Tolo Highway and KCRC East Rail tracks; and
4. Associated retaining walls, footpaths, cycle tracks, cycle parks, drainage works, and landscaping works.

Location Pak Shek Kok, Shatin, New Terriotries, Hong Kong
Commencement Date December 2007
Type Management contracting – Civil engineering
Completion Date February 2011