Commercial

Tai Tung Building

This project involved construction of a single-level basement, three levels of commercial podium for shops and restaurants, and a 24-storey office tower above the podium structure. A Grade 60 reinforced-concrete building with unitized curtain wall and aluminum louvre structures, fitting out works, water cool chiller system, and Intelligent Building System installations were included. Completed within a period of 26 months, it won numerous accolades including the Considerate Contractor Award from the Environmental Transport and Work Bureau.

Location Wanchai, Hong Kong Island, Hong Kong
Commencement Date October 2002
Type Management contracting – Building
Completion Date December 2004