Current Projects

Current Projects

Hong Kong   
Home Ownership Scheme Project at Hin Tin Street Shatin Area 31  
Modification works of Hong Kong International Airport Contract P535 - West Hall   
SCL 1114 - Pedestrian Links at Tsz Wan Shan  
MTR Express Rail Link - West Kowloon Terminus Station South  
Construction management services for The University of Chicago Center in Hong Kong   
Site formation and foundation works for Ocean Park Tai Shue Wan Development  
Management contract for proposed hotel development at Wai Man Road, Sai Kung  
Main contract works for residential development at 128 Pok Fu Lam Road  
Excavation and lateral support and piled foundation works for Happy Valley Clubhouse extension  
Main contract works for the residential development at Kai Tak Area 1I, Site 3  
Demolition and foundation works for SCAA Grandstand South at 88 Caroline Hill Road, Causeway Bay  
Substructure and utilities diversion works for Extension of Theatre Block of Tuen Mun Hospital  
Main contract works for the alteration and addition works at Nan Fung Textile Mills  
Civil and building works for Unit L10 at Lamma Power Station Extension  
Main contract works for residential development at Ka Wo Li Hill Road, Tuen Mun  
Interior fitting out works to Tower 1, Tower 2 and Tower 3 for The Hong Kong Ocean Park Marriott Hotel at Ocean Park  
Basement and superstructure works for the residential development at Kau To Area 56A  
Refurbishment of circulating water culverts at Lamma Power Station  
Main contract works for commercial development at 2-4 Shelley Street, Central   
Building and civil maintenance and minor works to DSD plants and facilities  
Main contract for The French International School of Hong Kong at Tseung Kwan O  
Public housing development of Choi Fook Estate Phase 3 and Sports Centre, Kwun Tong   
Site formation, foundation and pile cap works for residential development at 23 Po Shan Road, Mid-Levels West  
Main contract for the residential development at Castle Peak Road - Tai Lam, Area 55, Siu Sau, Tuen Mun  
Construction of Subsidised Sale Flats Development at Tseung Kwan O Area 65C2 Phases 1 and 2  
Construction of Subsidised Sale Flats Development at Tung Chung Area 27  
Main contract works for residential development at Castle Peak Road - Castle Peak Bay, Area 48, Tuen Mun  
Construction of temporary footbridge for proposed commercial development at No.2 Murray Road, Central  
Main contract works for the proposed residential development at 9 Sai Wan Ho Street, Shau Kei Wan  

 

Macau
Main contract works (Lot 7) for the Concordia Development at Coloane
Comprehensive development for "THE 13" Hotel
Fitting out works to casino gaming hall, F&B outlets and entrances for Grand Lisboa Palace

 

Mainland China
Main contract works for residential development at Xujing, Shanghai
Interior fitting out works for Victoria’s Secret, Lippo Plaza, Shanghai

 

Other regions
Conversion works for hotel at 178 Tyrwhitt Road, Singapore